P. ServiceWater professionals
Project

NRW Condition Assessment and Methodology Design for the Safawi New Proposed Transmission Pipeline

Sajdi Engineering Consulting Center · Jordan · 2026

Sub-contracted to perform NRW condition assessment for the new proposed Safawi transmission pipeline. The scope of services delivered included site inspections, operational analysis, identification of service connections across the pipeline, demand and water losses projections studies, updating the GIS layout for the pipeline, desktop review for O&M records and engineering designs that concluded with methodology development to enable NRW baselining during implementation phase including supervision work for the contractor, to ensure results-based improvements for the project execution.

Our team have successfully completed the necessary services, site walkthroughs and quality management during implementation along with validation of NRW baselining reports and operational efficiency optimization ensuring sustainability measures for YWC.

← Back to all projects

Let's work together

Ready to build more resilient water systems?