Tasked with conducting site evaluation and subsurface utility engineering for pre-identified high-risk locations at Arab Potash Company, using ground-penetrating radar (GPR) and other set of tracing technologies to map, identify, and coordinate existing underground utilities. The short-term assignment concluded with delivery of a comprehensive report, providing data interpretation and actionable recommendations to mitigate risks associated with buried utilities, supporting safe and efficient implementation across project area.
Project
Condition Assessment for Selected Facilities at Arab Potash Company
Arab Potash Co. · Jordan · 2024

Related projects

2026 to 2027 · Jordan
DMAs Establishment and NRW Baselining Measurement in Tafila Governorate
Contracted to establish DMAs under the USAID-funded project to upgrade the Tafila Water System, alongside NRW baselining. The scope included operational assessments and site verification to ensure reliable water supply...

2026 · Jordan
NRW Baselining and Assessment for the Project of Restructuring Water Network in Maan Governorate
Sub-contracted to perform an operational condition assessment of the primary water system under the World Bank-funded project for restructuring water network in Maan Governorate. The assignment focused on establishing...

2026 · Jordan
Condition Assessment, NRW Baselining and Operational Improvement Plan for the Lajjoun-Ghwair Transmission Pipeline
Sub-contracted to conduct condition assessment for Lajjoun-Ghwair Transmission Pipeline (approximately 20 km) including NRW baselining and operational analysis aimed at identification of water losses that represented in...
Let's work together